The 90-Day Kitchen Equipment Timeline
Commercial kitchen fit-outs run on a fixed rhythm: when the menu is locked, when equipment is ordered, and when installation starts. Every stall pushes the opening date. Using a typical 90-day preparation window, here is the equipment-side timeline, the checkpoints at each stage, and the three places projects most often get stuck.